Case ID: IMB385     Solution ID: 29784

Brand Revitalizing and Brand Reinforcement The Case of Arrow Shirts in the Indian Context Case Solution

Abstract

With a few brands in the premium shirt showcase, the Arrow brand confronted the test of adjusting its premium affiliations that had been sustained in the past to make the brand contemporary. The idea of premiumness concerning the class had experienced a movement, with similarly solid brands (practically identical to the Arrow brand) fortifying their situating on premiumness. Bolt confronted a few testing choices that included its unique situating. The major choice on revitalizing and strengthening the brand would rely on upon the examination of the evolving environment, aggressive offerings from contending brands and the view of shoppers on Arrow and its rivals. The premium shirt business sector had brands that offered equivalent useful qualities; and the separation of brands was constructed by both utilitarian property situating and typical situating. Adjusting the two angles and rotating between these two perspectives in a dynamic class and environment obliged a methodology that would bring a few parts of purchaser conduct towards a brands procedure. As the opposition strengthened, there was requirement for any brand to dig into the better parts of shopper conduct instead of rely on upon the fundamental situating systems. There was a need to dissect how shopper conduct procedures could add to the brands situating techniques. Should Arrow hold its classification ability? Should the brand hold its nation of birthplace affiliations? Should the brand concentrate on the self-idea connected with the buyer fragment? A mixture of ideas that can trigger Arrows next level of brand system is the connection postured by this case in a developing market, for example, India.


Request Case Study Solution

Prepared by MBAs and CFAs according to your requirements


Words
Pages
Upload

 

Already Registered? Login here!

 

Order Summary

SubjectNot Selected
LengthNot Selected
Deadline Not Selected
Estimated Submission On
Total 0